Power has been restored to all equipment within the facility.
If a device within your rack is without power, please reach out to our team who can manually intervene at no charge as required.
Power is now being restored to each rack, one at a time.
We expect services to be restoring in approximately 30 minutes.
Power has been disrupted. Engineers continuing investigations.
Power has been restored, engineers are monitoring restoration.
Site power has been lost.
Engineers are continuing to investigate.
We are aware of a single power feed loss at our Vetta CH01 datacentre site.
Engineers are en-route to investigate. Updates to follow.