chc2 PoP (Vetta CH01)

Incident - Christchurch DC power - 07/08

解決済み

Power has been restored to all equipment within the facility.
If a device within your rack is without power, please reach out to our team who can manually intervene at no charge as required.

原因確定

Power is now being restored to each rack, one at a time.

原因確定

We expect services to be restoring in approximately 30 minutes.

検証中

Power has been disrupted. Engineers continuing investigations.

監視中

Power has been restored, engineers are monitoring restoration.

検証中

Site power has been lost.
Engineers are continuing to investigate.

検証中

We are aware of a single power feed loss at our Vetta CH01 datacentre site.
Engineers are en-route to investigate. Updates to follow.