AKL-162G Power Changes

Zakończone
Rozpoczęte
Planowana prace konserwacyjne

Due to some power changes required at our AKL-162G datacentre, we are required to power down and back on some equipment, which may cause micro-outages of around 5 minutes each during the maintenance window specified.
This may also result in a reboot of some colocated servers as required during this time.

2 Usługi, których dotyczy problem: